Saint Petersburg
Head office and production site
1Ex e IIC Gb
Ex tb IIIC Db
RP Ex e I Mc
| Order item number | Dimensions, mm | ||||
|---|---|---|---|---|---|
| D1 | D2 | A | B | L | |
| NTM-PBK30/KPG | 30 | 38 | 15 | 15 | 76 |
| NTM-PBK40/KPG | 40 | 50 | 20 | 20 | 76 |
| NTM-PBK50/KPG | 50 | 60 | 30 | 30 | 76 |
| NTM-PBK70/KPG | 70 | 85 | 40 | 40 | 72 |
| NTM-PBK100/KPG | 101 | 115 | 60 | 60 | 72 |
| NTM-PBK125/KPG | 125 | 140 | 80 | 80 | 72 |
| NTM-PBK150/KPG | 151 | 165 | 90 | 90 | 72 |
| NTM-PBK200/KPG | 200 | 215 | 120 | 120 | 72 |
1. The mounting frame is installed in the prepared opening and secured in a suitable manner (by welding or bolting).
2. The press block is installed in the fixed frame.
3. The sealing section of the press block is filled with transit modules, inside which cables and pipes are first placed.
4. Tighten the press block bolts by turning them alternately in a crosswise pattern until the transit modules are completely sealed.
Drag files here
CAD " GORELTEX ", questionnaires, necessary documents
Head office and production site
Sales office
Sales office
Sales office and production site
Sales office
Sales office