Joint meeting of TC 403 with the Moscow City Council on the premises of STS LLC
Representatives of the explosion-proof equipment plant KORTEM- GORELTEX took part in a joint meeting of TC 403 "Equipment for explosive environments (Ex Equipment)" and the IGS (Interstate Council for Standardization, Metrology and Certification), held on June 24, 2014, on the territory of SST LLC, Mytishchi.
Life cycle of equipment for explosive atmospheres
Any technical object created by man eventually wears out during use or becomes obsolete, that is, it ceases to satisfy newly imposed requirements.
The time interval from the beginning of the creation of a technical object to the end of its operation is called the life cycle of a technical object, while the beginning of the life cycle is traditionally understood to be the emergence of the idea of the need to create a system, and the end is its decommissioning.
The life cycle of explosion-proof electrical equipment can be divided into six stages: production, market entry, installation, commissioning, operation, and continued operation.
Each of these stages, in turn, consists of individual steps. Certification is a mandatory step of each stage.
Thus, at the production stage of explosion-proof electrical equipment, Quality System certification must be conducted, confirming that the certified organization is capable of supplying products that meet the stated requirements. Certification effectively means that the organization's quality system complies with the requirements of a specific standard.
Personnel certification confirms that the qualitative characteristics of personnel, such as education and professional competence, meet the requirements of current standards. The rapid development of industry and services means that specialists are required to meet new requirements every year regarding their knowledge of technology, software, and regulatory documents. Therefore, there is a need for periodic personnel assessment to ensure compliance with currently accepted criteria. Certification ensures an objective and independent assessment.
The main content of targeted research in the process of managing the life cycle of explosion-proof equipment are: analysis of the predicted state of objects, determination of expected and actual operating results, assessment of priorities in solving local problems and identification of preferred areas of resource use.
The purpose of certification at all stages of the life cycle of explosion-proof equipment is to determine its compliance with the elements of the quality system that ensure the stability of product characteristics established in the regulatory documentation for manufactured products and controlled during certification (verification of compliance with standards, rules and measures to ensure the quality and safety of explosion-proof products).
AGENDA of
the meeting of TC 403 “Equipment for explosive environments (Ex Equipment)”
June 24, 2014, Tuesday
Venue of the meeting: SST LLC, Mytishchi
Meeting start time: 10.00
Item No |
Name |
Document |
Speaker |
| 1 | Opening of the meeting | - |
A.S. Zalogin |
| 2 | Approval of the agenda | Agendas | A.P. Porshina |
| 3 | Report on the implementation of decisions on the minutes of previous meetings of 04.07.2013 and 10.09.2013. | Report 04.07.2013 Report 10.09.2013 |
A.P. Porshina |
| 4 | On the progress of work on national and interstate standardization programs (NIS/ISP): | - |
A.P. Porshina |
| 4.1 | On approval of standards for PNS/PMS 2012-2013 | PNS/PMS 2012-2013 | A.P. Porshina |
| 4.2 | On the review of summaries of reviews and approval of final versions of draft standards for PNS/PMS 2013-2014 | PNS/PMS 2013-2014 | A.P. Porshina |
| 4.2.1 | Explosive atmospheres. Part 0: Equipment – General requirements. Development of GOST Direct application of MS–IDT. IEC 60079-0 (2011), and Corrigendum 1 (2012). Subject code: 1.15.403-2.009. 13/RU.1.124-2013 | Summary of Feedback Explanatory Note Final Version |
Yu.P. Minovsky |
| 4.2.2 | Explosive atmospheres. Part 11: Equipment with type of protection "intrinsically safe electrical circuit "i". Development of GOST Direct application of MS-IDT IEC 60079-11 (2011) and Corrigendum 1 (2012). Subject code: 1.15.403-2.010.13/RU.1.125-2013 | Summary of Feedback Explanatory Note Final Version |
O.B. Malkovich |
| 4.2.3 | Explosive atmospheres. Part 13: Equipment with the type of protection "hermetically sealed chambers or structures." Development of GOST Direct application of IEC 60079-13 (2010). Subject code: 1.15.403-2.011.13/RU.1.126-2013 | Summary of Feedback Explanatory Note Final Version |
N.N. Prelovsky |
| 4.2.4 | Explosive atmospheres. Part 15: Equipment with type of protection "n". Development of GOST Direct application of IEC 60079-15 (2010). Subject code: 1.15.403-2.015.13/RU.1.115-2013 | Summary of Feedback Explanatory Note Final Version |
Yu. V. Kovorov |
| 4.2.5 | Explosive atmospheres. Part 19: Repair, testing, and restoration of electrical equipment. Development of a GOST based on GOST R IEC 60079-19-2011. Direct application of IEC 60079-19 (2010). Subject code: 1.15.403-2.014. 13/RU.1.114-2013 | Summary of Feedback Explanatory Note Final Version |
V.V. Popov |
| 4.2.6 | Explosive atmospheres. Part 33: Equipment with special type of protection s. Development of GOST Direct application of MS - IDT IEC 60079-33 (2012). Subject code: 1.15.403-2.013. 13/RU.1.117-2013 | Summary of Feedback Explanatory Note Final Version |
V.V. Saveliev |
| 4.2.7 | Headluminaires for use in mines with a firedamp hazard. Part 1. General requirements and test methods related to explosion risk. Developed by GOST Direct application of IEC 60079-35-1 (2011). Subject code: 1.15.403-2.005. 13/RU.1.120-2013 | Summary of Feedback Explanatory Note Final Version |
S.V. Serov |
| 4.3 | On the preparation of the first editions of the PNS/PMS 2014-2015. | PNS/PMS 2014-2015 | A.P. Porshina |
| 4.4 | On the proposals of the Labor Code in the PNS/PMS 2015-2016. | PNS/PMS 2015-2016 | A.P. Porshina |
| 6 | On the introduction of amendments to GOST 30852.1-2002 in the Russian Federation | Change 1 | A.I. Timofeeva |
| 7 | On the development of an amendment to GOST 30852.0-2002 based on Amendment 1 to GOST 51330.0-99 | Change Project | A.I. Timofeeva |
| 8 | On Amendments to Decision No. 73 of May 13, 2014 of the Customs Union Commission of October 18, 2011 No. 825 | Decision No. 73 of May 13, 2014. | A.I. Timofeeva |
| 9 | Information on IECEx meetings (ExCU and ExTAG meetings) | A.S. Zalogin | |
| 9.1 | Information about the meeting of the ExCCU | V. Ya. Grudtsyn | |
| 9.2 | Information about ExTAG meetings | A.S. Zalogin | |
| 10 | On the revision of the Labor Code regulations | A.I. Timofeeva | |
| 11 | On the introduction of GOST R ISO/IEC 80079-34-2013 "Explosive atmospheres. Part 34. Application of quality systems for equipment manufacturing" | Letter from NP SC NASTKHOL | A.P. Porshina |
| 12 | Regarding the accession of new members to the TC. Consideration of the application from Saturn Gas Turbines Open Joint-Stock Company | Application from JSC Saturn – Gas Turbines | A.P. Porshina |
| 13 | On the implementation of contracts in 2013. | A.P. Porshina | |
| 14 | Miscellaneous | A.P. Porshina | |
| 15 | Date and place of the next meeting of TC 403 | A.P. Porshina |