• Distribution and Terminal Boxes
  • Control and Automation Cabinets
  • Lighting Equipment
  • Control and Indicating Stations
  • Visual, Audible and Signaling Devices
  • Electrical Heating and Fans
  • Video Surveillance
  • IT equipment
  • Spark protection barriers and functional safety relays
  • Cable Glands, Conduits
  • Sockets, Plugs, Extension cords
  • Switches, Selectors Switches, Sensors
  • Control and Measuring Instruments
  • Cable/Pipe Transits
  • Electrical Components and Materials
Logo

Category

May 13, 2014

18th Uzbekistan International Exhibition "Oil and Gas 2014"

Explosion-proof equipment plant KORTEM-GORELTEXPLANT LLC GORELTEX) presented exhibition stand #E82 at the OIL AND GAS. At the KORTEM-GORELTEX , visitors were able to learn about the latest developments in explosion-proof electrical equipment from KORTEM-GORELTEXPLANT LLC GORELTEX) as well as proven classic models from the product range.

FACTS ABOUT THE PREVIOUS EXHIBITION AND CONFERENCE OGU 2013:

  • The exhibition is certified by the Global Association of the Exhibition Industry (UFI), confirming the quality and compliance of the event with world-class standards
  • 122 participating companies from 37 countries
  • Total exhibition area – 2,026 sq. m
  • Around 7,000 visitors from 30 countries; 98% were oil industry professionals
  • 450 delegates and 48 speakers at the conference

COOPERATION BETWEEN RUSSIA AND UZBEKISTAN IN THE OIL AND GAS SECTOR

In 2013, trade turnover between Russia and Uzbekistan grew by 9.4%, a record high in the history of trade and economic relations between the two countries. More than $600 million in Russian investment was channeled into Uzbekistan to implement promising mutually beneficial projects.

Deputy Chairman of the Gazprom Management Committee Alexander Medvedev and Chairman of the Management Committee

Uzbekneftegaz National Holding Company, Shokir Fayzullaev, signed a contract for the purchase of Uzbek gas and an agreement on gas transportation through Uzbekistan for the period 2013–2015.

In 2013, LUKOIL Uzbekistan began producing and transporting gas to the Mubarek Gas Processing Plant. The plant is planned to process and transport 2.2 billion cubic meters of gas per year.

Bashkir enterprises of the oil and gas and petrochemical complex (PromSist, NVP Orbita, Kresol, etc.) signed cooperation agreements with Uzbekneftegaz National Holding Company, Fergana Oil Refinery State Enterprise, Shurtan Gas Chemical Combine State Enterprise, etc.

Venue: Uzbekistan, Tashkent, Amir Temur Street, 107, Uzexpocentre National Exhibition Complex, Pavilions 1, 2




• XIII North Caspian Regional Exhibition "Atyrau Oil and Gas" from 01.05.2014 to 03.05.2014, Republic of Kazakhstan, Atyrau

• 17th International Exhibition of the Oil and Gas Industry "Oil and Gas - 2013" from 10.22.2013 to 10.24.2013, Ukraine, Kyiv

• XXI International Specialized Exhibition "GAS. OIL. TECHNOLOGIES - 2013", from 05/21/2013 to 05/24/2013, Russia, Ufa